| Project background and context Upton forms phase one of the South West District, the designated expansion area within Northampton. The urban extension on 44 ha (108.7 acres) of greenfield land is within 20 minutes walk of the railway station and a 10-minute bus ride of the town centre. When complete, Upton will comprise 1,382 homes, a local centre and a primary school. In 2001, a consortium of English Partnerships (the landowner), The Prince’s Foundation and Northampton Borough Council embarked on the Upton project to demonstrate and promote sustainable urban growth. This new urban extension was to involve innovative stakeholder engagement as an integral part of developing the spatial plan.
Back in 1997 a conventional, car-oriented, residential layout had been granted outline planning permission for the Upton site. However, a consultant team led by EDAW challenged the principles and design of this permission at an Enquiry by Design (EbD) workshop in 2001. This team was then appointed to work with the local community. Following the EbD workshop, a new framework plan was developed based on design principles agreed with the stakeholders. A design code was used to maintain quality throughout implementation. This code is used as a tool for collaboration with the major housebuilders, with the objective of raising the standard of UK housebuilding based on traditional placemaking principles and high environmental performance.
The development of Upton’s masterplan has taken an integrated and holistic approach to sustainability, seeking to balance environmental, economic, ecological and social issues. This is reflected in strategies that: - reduce resource consumption and the production of waste;
- enhance the site’s biodiversity;
- increase the efficiency of infrastructure provision;
- balance provision of homes with local jobs and amenities;
- create a distinctive and identifiable place.
Environment and ecology
Environmental sustainability is integrated at every level. It informs the layout and urban design of the masterplan through building orientation, rainwater management and street network and by minimising the carbon footprints of the buildings.
The masterplan creates a compact urban form that encourages residents to walk to local amenities and reduce their dependence on cars. Orientation of streets and buildings maximise natural lighting in buildings, and increases the efficiency of rooftop photovoltaic cells. At the same time, care has been taken to ensure that a strong sense of place is well integrated with the overall environmental strategy.
The masterplan provides an extensive landscape network that incorporates green space and sustainable urban drainage system (SUDS) measures. This extensive and accessible landscape network re-engages residents with nature, promotes a more active lifestyle and encourages biodiversity.
The SUDS incorporates green swales into the streetscape that help manage surface water drainage and encourage on-site infiltration. This provides an excellent network for local wildlife, in turn promoting biodiversity for the wider area. The use of SUDS is also incorporated into the two neighbourhood squares, local play areas and playing fields. Excess water is gravity-fed through the SUDS network to the Nene Way long distance footpath and Upton Country Park before finally draining into natural watercourses.
Alongside the site-wide measures, all buildings in Upton will achieve a minimum BREEAM Excellent rating, which is equivalent to Code 3 or 4 under the recently published Code for Sustainable Homes. The ratings will be achieved through a holistic approach to green building design and planned layout, as well as environmental technologies such as photovoltaic cells, wool insulation, solar hot water systems, micro wind turbines, micro CHP, green roofs, rainwater harvesting systems and locally sourced building materials.
Economic sustainability
The average net density of 45 dw/ha at Upton ensures the efficient use and viability of infrastructure including the local centre, public transport and community facilities. Shared amenities are important tools in creating social bonds and promote equity within the new community. The local centre has been carefully planned to meet resident needs by offering shops, offices, a pub, a nursery and live-work units. The inclusion of workspace and flexible building forms encourages working from home.
The masterplan design guidelines specify high-quality public realm design and architecture to retain long-term investment value. The establishment of the Upton Management Company will provide stewardship and maintain the public realm, SUDS, neighbourhood squares and playing fields. Consultation and engagement
Momentum generated by the EbD workshops has been maintained through the Upton Steering Committee, which meets every six to eight weeks, with membership drawn from local residents, Upton Parish Council, NBC Council, project partners and key consultants. |